Present Electric Load | 40.00 KW | Click here to view scanned copy of document |
Date of Connection | 22-02-1993 | |
Connection in the name of | Shri Suresh Parasram Yaul | |
Meter No. | 055-00006327 | |
Seal No. | – | |
Remarks |
Under the Grid Connected Solar roof Top state policy of Maharashtra through MSEDL, Parshuram ITI has installed a 6 KWp Solar Roof Top Power Plant. The auxiliary Power requirement at Parshuram ITI will be generated by this roof top solar plant and surplus power if any will transmitted to grid. The surplus would be transmitted to the grid through the Bi-directional net meter installed by MSEDCL. The project has been approved by MEDA & MERC.
The idea about setting up this project was initiated by Mr Suresh Yaul, Director of Parshuram ITI. Under his guidance, the project was successfully installed and commissioned.